UltrasonicLevelSensorsRequest a quote ↗
Menu

SPECIFICATION BEFORE RELEASE

Quality review & project documents

Ask for evidence that matches the configuration being ordered. A product-family description is not a released technical specification.

Documents to agree before order

Request a model-specific data sheet, dimensional drawing, wetted-material list, wiring and terminal diagram, loop-power/load requirements, output mapping and enclosure rating conditions. Define the scope of factory checks and the serial or batch identification needed for your project.

Hazardous-area documents

Ask for the exact certificate number, approved model suffix, issuing scheme, schedule, special conditions and installation requirements. A certificate for a different model, gas group, protection concept or jurisdiction does not establish approval for the offered assembly.

Inspection and acceptance

Agree functional checks for distance, signal scaling, fail state, relay action and any controller logic. A marketing graphic is not a calibration certificate, and a factory functional check is not automatically an accredited calibration. No factory audit, ISO certificate, SIL or MCERTS status is claimed without specific supporting evidence.

START WITH YOUR PROCESS

A useful quotation starts with the tank.

Send the medium, dimensions, connection and signal. Replacing an existing device? Include its exact model and controller.

Discuss your application ↗